Screen practical site capacity
Generate alternatives using real boundaries, exclusions, equipment relationships, roads, and spacing assumptions.
RE STACK for Developers
Test-fit BESS projects against real boundaries and constraints so practical capacity, equipment strategy, access, roads, and collection trade-offs become visible earlier. Run your own analysis with multiple manufacturers without relying on vendor constraints.
How much fits is only the first question
A parcel can hold the equipment on paper and still create a difficult project once access, roads, collection, replacement, and augmentation enter the plan. Turn the parcel into a clearer project decision.
Generate alternatives using real boundaries, exclusions, equipment relationships, roads, and spacing assumptions.
Account for access roads, turning areas, maintenance clearances, substations, collection corridors, and other space the project needs.
Compare equipment groupings, PCS relationships, road approaches, MV collection concepts, and augmentation allowances before detailed selection.
How RE STACK fits
Start with the commercial requirement, connect it to the site, and shortlist the directions worth advancing.
Set target MW, usable MWh at the relevant measurement point, duration, and equipment assumptions.
Apply parcel boundaries, setbacks, exclusions, infrastructure, access requirements, and known constraints.
See how layout and equipment strategies change utilization, roads, access, collection, and practical capacity.
Carry the strongest concepts into commercial evaluation, vendor engagement, permitting strategy, and deeper engineering.
The space has a job
Some areas support fire-apparatus access. Others preserve replacement routes, cable corridors, drainage, maintenance clearances, or future augmentation. Treating all open space as packing area can make a layout look stronger than the project really is.
See whether geometry, roads, access, exclusions, or equipment relationships are governing site capacity.
Understand how a different block or PCS arrangement reshapes the site before the selection becomes difficult to unwind.
Use early layouts to identify promising strategies for further engineering, code review, and project-specific validation.
Bring a site and a storage target
Talk through your assumptions and compare practical BESS layout directions with RE STACK.